Home / Calculator / Juntai MBBR Calculator 2.0

Juntai MBBR Calculator 2.0

Date: 2023-08-11
1200 m²/m³
Output Assumed loading for this Process
SALR BOD5 Loading Rate ( Removal) 15 gr/m².day( This can be 4 to 25, most time we choose 5 is safe)
SALR  NH₄ - N loading Rate ( Removal) 1.5 gr/m².day( This can be 0.4 to 2, mosttime we can choose 1 is safe)
Input daily flow Rate 1728 m³/day
72.00 m³/hr
456,273.76 gpd
Input BOD -  Influent 850 mg/l
Input Primary BOD removal 0%
Input Anoxic BOD removal 0 mg/l
Input BOD - Effluent 300 mg/l
Input NH₄-N - Influent 41 mg/l
Input NH₄-N - Effluent 10 mg/l
BOD removal - Biologically 550
NH-N removal - Biologically 31
BOD loading per day 2092.9 lb. of BOD / day
950,189 grams/day
NH-N loading per day 118 lb. of Nh3-N / day
53,556 grams/day
MBBR Tank 1
Surface area required 63,346   - BOD Oxidation
Media volume 53
Tank volume m³ 151 media Fill-in 35.0%
MBBR TANK2   
Surface area required 35,704   -  Nitrification
Media volume 30
Tank volume m³ 85 media Fill-in 35.00%
Total media volume 82.54
Tank Volume 235.83
Any question or more information, please contact [email protected]
Hangzhou Juntai MBBR Media Design Datameter
Parameter Units Values
Model CBM MBBR19
Size mm 25 X 12
Hole numbers pcs 19
Bulk density kg/m3 95
biofilmed Density g/cm3 0.96 – 0.98
Number per m3 pcs/m3 11800
Surface area m2/m3 > 650
Void ratio % 0.85
Dosing ratio % 15  to 60
Membrance-forming time days 5 to 18 ( base on the temperature)
Nitrification efficiency gNH4-N/m2.d 0.4– 2
SALR BOD5 Loading Rate ( Removal) gBOD5/m2.d 2 – 25
SALR COD  Loading Rate ( Removal) gCOD5/m2.d 4 – 25
Applicable temperature 5– 40
Life-span year >15
www.chinambbr.com  for more information

Contact Us

*We respect your confidentiality and all information are protected.

×
Password
Get password
Enter password to download relevant content.
Submit
submit
Please send us a message